quality
Quality & Electrical Testing
100% test coverage with full traceability
Every assembly is verified with automated continuity, hi-pot, and pull-force testing. Certifications and reports are archived against each lot for full traceability.
Highlights
What you get
- 100% continuity & hi-pot testing
- Automated pull-force verification
- Lot-level traceability and COC
- PPAP and first-article reporting
Specs
Capability specs
| Electrical test | Continuity + hi-pot |
|---|---|
| Mechanical test | Pull-force, crimp micro-section |
| Documentation | COC, FAIR, PPAP |
| Coverage | 100% of units |
Process
How we deliver
- 1
Incoming inspection
Verify components against BOM and drawing.
- 2
In-process checks
Crimp height, pull-force, and AOI at each station.
- 3
Final electrical test
100% continuity and hi-pot on custom fixtures.
- 4
Documentation
Issue COC and archive results per lot.
FAQ
Common questions
Do you provide PPAP?+
Yes, we support PPAP levels 1-5 for automotive and regulated industries.
Not sure which equivalent fits your spec?
Describe your part number, connector, or cable — our AI matcher returns an engineer-verified equivalent in seconds.